horseshoe map

Dallas Horseshoe Project

The Dallas Horseshoe project is a design build project reconstructing IH 30 and IH 35E interchange in downtown Dallas.

MICA is responsible for all of the roadside signing, overhead sign structures and signs, roadway and high mast illumination, decorative pedestrian lighting that will line a walkway on the Trinity River, traffic signals, and an ITS package that includes an Active Traffic Management (ATM) system, CCTV camera’s and mounting structures, lane control signals, and the dynamic message signs.